• 2012
    Entered into operation
  • 25 MW
    Installed capacity
  • 112妇女和
    Annual production

The power plant has a total head of 83m and the powerhouse is equipped with two Francis turbines, which receive water through a 1,415m long tunnel, 5.65m in diameter. The RCC dam is 22m high.

 

Passos Maia hydropower plant
Passos Maia hydropower plant. (Photo: 十大最好的网赌平台)
公司 Ownership share
十大最好的网赌平台 50%
Adami S/A Madeiras 50%

Find out more about our activities in 巴西